Motorists are advised of the following traffic interruptions:<\/strong><\/p>\n Station Street will be reduced to two lanes in both directions between Smythe Street and Garden Street starting Wednesday, September 16 for two (2) days from 7 a.m. until 9 p.m. for asphalt resurfacing.<\/p>\n","protected":false},"author":11,"featured_media":277,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[25,138],"class_list":["post-2058","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general","tag-construction","tag-traffic"],"yoast_head":"\n\n\n
\n Street:
\n<\/strong><\/td>\n<\/td>\n Station Street<\/td>\n<\/tr>\n \n Date:
\n<\/strong><\/td>\n<\/td>\n Starting Wednesday, September 16<\/td>\n<\/tr>\n \n Time:
\n<\/strong><\/td>\n<\/td>\n 7 a.m. until 9 p.m.<\/td>\n<\/tr>\n \n Duration:
\n<\/strong><\/td>\n<\/td>\n Two (2) days<\/td>\n<\/tr>\n \n Direction:
\n<\/strong><\/td>\n<\/td>\n Reduced to two lanes in both directions<\/td>\n<\/tr>\n \n Specific Area:
\n<\/strong><\/td>\n<\/td>\n Between Smythe Street and Garden Street<\/td>\n<\/tr>\n \n Description of Work:
\n<\/strong><\/td>\n<\/td>\n Asphalt resurfacing<\/td>\n<\/tr>\n \n \nMotorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage, and drive safely. Work commencement and completion times are subject to change. Weather permitting.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"